Please wait a minute...

Current Issue

2008 Vol.0, No. 4   Published: 28 August 2008
           
Design study

Calculation on circumferential crack and axial crack resistance of embedded pipe below dam

2008, 0 (4): 1-3   

Operation management

Aging and safety evaluation of concrete dam

2008, 0 (4): 4-8   

Hydro-geochemical modeling of water-rock interactions in dam foundation

2008, 0 (4): 9-11   

Research on seepage of Huolianfan reservoir dam

2008, 0 (4): 12-15   

Introduction to Emergency Action Plan of the KYRK?SJ?RVI reservoir dam

2008, 0 (4): 16-19   

Application of sand track and reporting system in Fengjiashan reservoir

2008, 0 (4): 20-21   

Monitoring technology

Safety monitoring in construction and its application

2008, 0 (4): 22-25   

Suitability and applicability of standpipe piezometer for seepage pressure monitoring of embankment dams———Discussion on Opinions of two issues in seepage pressure monitoring

2008, 0 (4): 26-30   

Application of fiber bragg grating in tunnel stress and strain monitoring system

2008, 0 (4): 31-33   

Data analysis

Observation and analysis on seepage in initial impoundment period of Jilintan I hydropower station

2008, 0 (4): 34-37   

Monitoring data analysis on seepage and displacement of Qiafuqihai dam in construction

2008, 0 (4): 38-41   

Cause of sharp transition of measured value by water level settlement gauge at Qinshan dam

2008, 0 (4): 42-45   

Stability analysis on right bank slope of Danshui-pie channel

2008, 0 (4): 46-49   

Construction technology

Construction of impervious wall and its effect at Gaopoling reservoir dam

2008, 0 (4): 50-52   

Bank protection by dumped riprap above water in Zuojiang hydropower station

2008, 0 (4): 53-56   

Rehabilitation

Application of HK-G-2 epoxy grouting material in steel lining void treatment at hydropower stations

2008, 0 (4): 57-60   

Scouring treatment of downstream dam face and bank slope at Changhu hydropower station

2008, 0 (4): 61-64   

Underwater anti-seepage treatment of crack on face slab at Jiguang reservoir

2008, 0 (4): 65-66   

Analysis on existing problems of Shahe project and rehabilitation measures

2008, 0 (4): 67-69