Please wait a minute...

Current Issue

Special column for Wenchuan Earthquake

Introduction on risk elimination and emergency treatment of hydropower dams in Wenchuan earthquake area

2008, 0 (3): 1-2   

Introduction on emergency inspection of Bikou damafter 5·12 earthquake

2008, 0 (3): 3-5   

Introduction on emergency inspection of Hanpingzui dam after 5·12 earthquake

2008, 0 (3): 6-8   

Design study

Brief introduction of casing project at Ganhe reservoir water release tunnel

2008, 0 (3): 9-10   

Operation management

Study situation and critical technology of emergency preparedness plan for unexpected events of reservoirs

2008, 0 (3): 11-14   

Research progress and prospect in risk assessment of reservoir damin China

2008, 0 (3): 15-19   

Analysis on treatment of seven aging diseased dams

2008, 0 (3): 20-24   

Management of hydraulic structures at Three Gorges hydropower station during initial operation period

2008, 0 (3): 25-29   

Research on filter in foundation drain hole of Gezhouba hydro project

2008, 0 (3): 30-31   

Stability analysis on abutment cracks of Huanren single supporting pier solid - head buttress dam

2008, 0 (3): 32-37   

Data analysis

Analysis on foundation uplift pressure of Qingxi dam

2008, 0 (3): 38-40   

Analysis on influence of dam top loads to structural stability of dam slope

2008, 0 (3): 41-44   

Application of displacement hybrid - model in deformation analysis at Xin’anjiang dam

2008, 0 (3): 45-48   

Monitoring system design and monitoring data analysis of Shuikou ship elevator

2008, 0 (3): 49-52   

Construction monitoring of continuous envelope wall

2008, 0 (3): 53-56   

Deflection monitoring and analysis of Xianju dam

2008, 0 (3): 57-59   

Detection method

Research on level degree detection of underwater dam surface by multi – beam

2008, 0 (3): 60-62   

Rehabilitation

Research on rehabilitation technology for earth- rock dams in Fujian province

2008, 0 (3): 63-65   

Cause reason of concrete cracks at Xixi damfoundation and its treatment

2008, 0 (3): 66-68   

Cause analysis of cracks on the face slab of LongshouⅡ(Xiliushui)damand its measures

2008, 0 (3): 69-72   

Freezing- thaw concrete treatment of dam, power tunnel and sediment releasing tunnel at Tuohai hydropower station

2008, 0 (3): 73-74   

Abrasive resistance and shock- proof measures for gate bottom plate with waste tyre

2008, 0 (3): 75-77