Abstract: This paper introduced the treatment construction of scouring above and under water of downstream dam face and bank slopes at Changhu hydropower station, which included the aspects such as treatment method, technical flow chart, construction quality control and operation after treatment.

摘要: 介绍长湖大坝下游坝面及两岸岸坡淘刷加固处理工程施工情况,重点是施工方法?工艺流程?质量控制及处理效果?