Please wait a minute...

Current Issue

Monitoring on deformation

Summary on deformation monitoring in TGP

2004, 0 (4): 1-4   

Rock mass deformation monitoring of TGP’s ship lock middle-isolated pier

2004, 0 (4): 5-7   

Deep rock mass deformation monitoring on high slope of TGP’S ship lock

2004, 0 (4): 8-10   

Analysis on sidewall deformation in TGP’s ship lock

2004, 0 (4): 11-13   

Analysis on deformation increment of the longitudinal joint after grouting in TGP

2004, 0 (4): 14-17   

Monitoring on seepage and stress-strain

Analysis on seepage monitoring result in TGP’S ship lock and its high slope

2004, 0 (4): 18-21   

Analysis on monitoring resuh in heat preserved and pressure loaded for unit spiral case of TGP

2004, 0 (4): 22-25   

Work behavior research on asphalt concrete core wall of TGP’s protection dam

2004, 0 (4): 26-28   

Analysis on monitoring of pre-stressed anchor cable at high slope of TGP’s ship lock

2004, 0 (4): 29-32   

Analysis on monitoring ofTGP’S ship-lift during foundation construetion

2004, 0 (4): 33-36   

Analysis on monitoring results of anchoring in the excavated slope for TGP’s ship lock

2004, 0 (4): 37-39   

Monitoring on hydraulics and dynamics

Hydraulic monitoring on the flood sluicing buildings in TGP

2004, 0 (4): 40-43   

Dynamic monitoring on arc-shaped flood gates in TGP’S flood sluicing section

2004, 0 (4): 44-47   

Dynamics monitoring on the gates and valves at TGP’S ship lock

2004, 0 (4): 48-51   

Monitoring on others

Elastic waves measuring method on dam foundation surface of TGP

2004, 0 (4): 52-56   

Rock mass acoustic emission on high slope of TGP’s ship lock

2004, 0 (4): 57-59   

Earthquake monitoring in reservior head region of TGP

2004, 0 (4): 60-64   

Technology of embedment and installation

New techniques and result analysis on construction of TGP’S cofferdam safety monitoring

2004, 0 (4): 65-68   

Application of telemetric coordinator in TGP

2004, 0 (4): 69-71   

Embedding apparatus in RCC of TGP

2004, 0 (4): 72-73   

Analysisonembeddingthepre-stressed anchorergometer

2004, 0 (4): 74-76   

Sum up

General design on safety monitoring decision support system for TGP

2004, 0 (4): 77-80   

Stress analysis and reinforcement design on the outlet of deep hole in TGP

2004, 0 (4): 81-83   

Contrastive analysis on monitoring and computation for scroll case and concrete in TGP

2004, 0 (4): 84-86