• Monitoring on hydraulics and dynamics • Previous Articles Next Articles
YU San-da and DENG Hao
Published:
於三大,邓浩
Abstract: This paper introduces some findings in the hydraulic monitoring of the flood sluicing buildings in the TGP when the water level is 135 m high.The monitoring result is integrated and systemic,it can be depended on check the project and established the operation regulations, as a reference, it is valuable in hydraulic projects design and operation under high water head.?
摘要: 本文主要介绍了三峡大坝泄洪建筑物在135m库水位时水力学观测成果.监测成果的完整性和系统性较好,为工程的验收、制定枢纽运行管理规程提供了科学依据。同时,对今后国内外高水头水利工程的设计和运行具有十分重要的参考价值。
於三大,邓浩. 三峡大坝泄洪建筑物水力学监测[J]. .
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX