Please wait a minute...

Current Issue

Overview

Present situation and prospect of hydropower development of Northeast Grid Co.

2009, 0 (4): 1-3   

Effect analysis on rehabilitation of overflow sections of concrete dams in cold area

2009, 0 (4): 4-8   

Empirical mode decomposition for dam rehabilitation effect evaluation

2009, 0 (4): 9-11   

Operation management

Preparedness for earthquake and emergency plan of Taipingwan hydropower station

2009, 0 (4): 12-15   

Influence of flood from Pushi river on flood discharge of Taipingwan hydropower station

2009, 0 (4): 16-19   

Safety management in reconstruction of energy dissipation structures of Hongshi dam

2009, 0 (4): 20-22   

Analysis on tailrace sedimentation after flood discharge and power loss at Taipingwan hydropower station

2009, 0 (4): 23-25   

Profit analysis of the tailrace dredging at Hongshi hydropower station

2009, 0 (4): 26-26   

Reservoir regulation

Construction and application of automatic water regime system at Taipingwan hydropower station

2009, 0 (4): 27-30   

Change of flood control level of Fengman reservoir

2009, 0 (4): 31-33   

Influence of human activity and flood forecast for Fengman dam

2009, 0 (4): 34-38   

Exploration of energy saving and emission reduction in Fengman reservoir regulation

2009, 0 (4): 39-42   

Perfection of automatic regulating system for Fengman reservoir

2009, 0 (4): 43-45   

Monitoring automation

Introduction of automatic dam safety monitoring system at Yunfeng hydropower station

2009, 0 (4): 46-48   

Operation of bi-metal automatic monitoring system at Yunfeng dam

2009, 0 (4): 49-51   

Data analysis

Renovation of crest vacuum laser collimation system at Fengman dam and data analysis

2009, 0 (4): 52-54   

Design of deformation monitoring and its monitoring data of Yunfeng dam

2009, 0 (4): 55-57   

Construction technology

Control of explosion in reconstruction of energy dissipation structures of Hongshi dam

2009, 0 (4): 58-59   

Management in reconstruction of energy dissipation structures of Hongshi dam

2009, 0 (4): 60-63   

Concrete construction management in reconstruction of energy dissipation structures of Hongshi dam

2009, 0 (4): 64-66   

Design optimization and removal of the cofferdam in reconstruction of energy dissipation structures of Hongshi dam

2009, 0 (4): 67-70   

Application of sealed orifice grouting in seepage elimination project at Fengman dam

2009, 0 (4): 71-72   

Rehabilitation

Measures for concrete crack control in Yongqing anti-regulating reservoir project

2009, 0 (4): 73-74   

Analysis of cracks on cement poles of Taipingwan hydropower station and its reinforcement

2009, 0 (4): 75-78   

Treatment of the seepage at the left abutment of Yunfeng dam

2009, 0 (4): 79-83   

Grouting test at the rock plug intake and solutions for main problems in reconstruction of Changdian hydropower station

2009, 0 (4): 84-86   

Treatment of the cracks on the left pier of dam section No. 49 of Yunfeng dam

2009, 0 (4): 87-91