• Operation management • Previous Articles     Next Articles

Profit analysis of the tailrace dredging at Hongshi hydropower station

LI Ji-gong and WU Feng-ji   

  • Online:2009-08-28 Published:2009-08-28

红石水电站发电尾水河床清挖工程效益分析

李继功,吴凤吉   

  1. 东北电网有限公司白山发电厂,吉林桦甸 132400

Abstract: This paper introduced the tailrace dredging at Hongshi hydropower station and analysed its profit.

摘要: 红石水电站尾水清挖完成后,平均尾水位降低了0.49 m,平均每年增加发电量753 万kW·h,取得了发电效益,本文对此作一简要介绍。