• Overview • Next Articles
LIU Feng-xue and FANG Guozhong
Online:
Published:
刘凤学,房国忠
Abstract: Hydropower is the ideal standby power supply for peak regulation and frequency modulation, but its proportion in Northeast Grid is small. As the development of grid and increase of peak-valley difference, to satisfy the need of grid, construction of hydropower plants and pumped storage power stations should speed up.
摘要: 水电是电力系统理想的调峰、调频和事故备用电源,但水电在东北电网中所占比重较小。由于电网的发展和峰谷差的加大,今后在加快风电、核电、火电等电站建设的同时,应加快常规水电和抽水蓄能电站的建设,以满足电网的需要。
刘凤学,房国忠. 东北电网公司水电现状及展望[J]. .
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://magtech.dam.com.cn/EN/
http://magtech.dam.com.cn/EN/Y2009/V0/I4/1