Please wait a minute...

Current Issue

Design study

Compression modulus of rockfill dams

2011, 0 (2): 1-11   

Operation management

Research on freezing prevention devices for arch gate

2011, 0 (2): 12-13   

Application of automatic water regime measuring system via GPRS Network at Wanyao reservoir

2011, 0 (2): 14-16   

Monitoring technology

Reconsideration on several issues in automation of dam deformation monitoring

2011, 0 (2): 17-23   

Rebuild of monitoring system at Tianhuangping pumped storage power plant

2011, 0 (2): 24-27   

Construction technology

Relation among raw materials, mix proportion, temperature rise and cracking performance of mass concrete

2011, 0 (2): 28-31   

Application of superfine sand pumping concrete in Bajiazui reservoir project

2011, 0 (2): 32-34   

Application of cement sand and gravel in overflow cofferdam project

2011, 0 (2): 35-41   

Renovation design of discharge gate at the fore bay of Zhangcun hydropower station

2011, 0 (2): 42-43   

Safety control and evaluation on excavation and blasting of tunnel intake at Xiakou reservoir

2011, 0 (2): 44-47   

Key points of environmental supervision in hydraulic and hydropower projects during construction period

2011, 0 (2): 48-51   

Discussion on construction quality control of hydraulic projects

2011, 0 (2): 52-53   

Analysis on cost control in project construction

2011, 0 (2): 54-56   

Application of filling technology in east Wenzhou polder dike project

2011, 0 (2): 57-62   

Rehabilitation

High pressure jet grouting at the culvert of Lingli reservoir earth dam

2011, 0 (2): 63-65   

Stability evaluation of dumping slope at right abutment of Kezier reservoir and its rehabilitation

2011, 0 (2): 66-70   

Metal structure

Renovation of electric control system for spillway gate at Shanxi hydropower station

2011, 0 (2): 71-74