Please wait a minute...

Current Issue

Design study

Analysis on scheme optimization of Hasang Hexi settling pond dam type

2011, 0 (1): 1-4   

Application of simple comprehensive parameter in detection of broken bar in alternating current motor

2011, 0 (1): 5-7   

Analysis on effective range and influence area of casing shaft punching-grabbed clay core wall

2011, 0 (1): 8-10   

Operation management

Consideration on the future technology of dam safety monitoring systems in IOT era

2011, 0 (1): 11-13   

Effect of operation temperature on steel-lined reinforced concrete penstocks

2011, 0 (1): 14-17   

Application of flood regulation system at Kezier reservoir

2011, 0 (1): 18-20   

Research and application of Luhun digital reservoir system

2011, 0 (1): 21-25   

Monitoring technology

Half product difference analysis on resistance ratio measurement error of differential resistance instrument

2011, 0 (1): 26-30   

Renovation of automatic monitoring system at Ertan dam

2011, 0 (1): 31-34   

Operation and maintenance of automatic safety monitoring system at Longyangxia dam

2011, 0 (1): 35-37   

Analysis on monitoring of concrete impervious face-slab masonry gravity rockfill dam

2011, 0 (1): 38-41   

Analysis on the monitoring data of piezometer level of right abutment at a dam

2011, 0 (1): 42-47   

Construction technology

Application of SK flexible coating in repair of expansion joints and cracks on concrete structure

2011, 0 (1): 48-51   

Construction quality management and control in dam curtain grouting

2011, 0 (1): 52-53   

Rehabilitation

Issues in rehabilitation of dam overflow sections

2011, 0 (1): 54-59   

Damage caused by 5·12 earthquake to Bikou dam and rehabilitation

2011, 0 (1): 60-63   

Technology information overseas

The safest dam

2011, 0 (1): 64-66   

Report on Taum Sauk pumped storage project——rebuilding Taum Sauk

2011, 0 (1): 67-74