• Special column for Wenchuan Earthquake •     Next Articles

Introduction on risk elimination and emergency treatment of hydropower dams in Wenchuan earthquake area

CHI Jianjun and ZHANG Xiu- li   

  • Online:2008-06-28 Published:2008-06-28

汶川地震后震区水电站险情排查及应急处置工作概述

池建军1,张秀丽2   

  1. 1.国家电力监管委员会, 北京 100861;2.国家电力监管委员会大坝安全监察中心, 浙江杭州310014

Abstract: This paper introduced the damage caused byWenchuan earthquake and the risk elimination, special inspection as well as emergency treatment measures. The idea that the experience should be learnt, and scientific hydro- energy utilization and management mode should be developed was advanced here.

摘要: 对汶川地震后震区水电站受损情况做了简要介绍, 对震区水电站采取的险情排查、特种检查和应急处置工作做了进一步阐述, 作者建议认真总结这次抗震救灾中水电站排险的经验教训, 结合在后恢复重建, 建立科学的水能开发和管理模式。