Please wait a minute...

Current Issue

2011 Vol.0, No. 3   Published: 28 June 2011
           
Design study

Design of protection system for dangerous rock mass on left bank slope of Pingtou dam

2011, 0 (3): 1-6   

Analysis on quality of cost documentation for hydraulic projects in design stage

2011, 0 (3): 7-8   

Operation management

Application of remote dam safety monitoring and control system

2011, 0 (3): 9-12   

Analysis and evaluation on seepage prevention performance of dam concrete in cold area

2011, 0 (3): 13-19   

Research on automatic control method on basis of water level at small hydropower station

2011, 0 (3): 20-24   

Monitoring technology

Experience of embedment of inner monitoring instruments at Lechangxia roller compacted concrete dam

2011, 0 (3): 25-28   

Design and application of dam deformation automatic monitoring system based on double basis stations GPS technique

2011, 0 (3): 29-32   

Data analysis

Back analysis on side slope parameters by incremental displacement method

2011, 0 (3): 33-35   

Influence of Wenchuan earthquake on foundation seepage of Chencun dam

2011, 0 (3): 36-42   

Analysis on safety monitoring data of Bikou dam

2011, 0 (3): 43-46   

Construction technology

Application of sash-shaped underground continuous wall foundation in Tongzilin hydropower project

2011, 0 (3): 47-50   

Application of pipe jacking method in hydraulic projects

2011, 0 (3): 51-52   

Construction technology of crushing side wall at Pankou face slab rock fill dam

2011, 0 (3): 53-55   

Rehabilitation

Application of chemical grouting in treatment of acidic water at Yixing project

2011, 0 (3): 56-61   

Treatment for the concrete cracks on the power tunnel of Dongwu reservoir

2011, 0 (3): 62-63   

Application of contact grouting for steel lining at Jinghong hydropower station

2011, 0 (3): 64-66