• Data analysis • Previous Articles Next Articles
CHEN Rong and LIU Lin
Online:
Published:
陈容,刘林
Abstract: 5·12 earthquake exerted some influence on Bikou dam. After that, two-year dam monitoring and data analysis showed that dam deformation was well-distributed and convergent, the saturation line was lower than designed elevation and the dam has been in normal operation state.
摘要: “5·12”汶川特大地震后,碧口大坝运行正常。通过震后两年半的大坝监测数据采集、整理及分析,碧口大坝变形均匀且趋于收敛状态,大坝浸润线测值均低于设计值,无异常变化,大坝处于正常运行状态。
陈容,刘林. 震后碧口大坝安全监测资料分析[J]. .
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://magtech.dam.com.cn/EN/
http://magtech.dam.com.cn/EN/Y2011/V0/I3/43