Please wait a minute...

Current Issue

Specification revision

Implementing specification earnestly for ensuring dam safety

2003, 0 (6): 1-2   

Introduction to revision of ele ctric industry standard DL/T5178-2003 regarding Technical Specification for Concrete Dam Safety Monitoring

2003, 0 (6): 3-6   

Target,basis and standard of dam safety monitoring system arrangement

2003, 0 (6): 7-8   

Performing perambulation and inspection to ensure dam safe operation

2003, 0 (6): 9-12   

On evolution and develo pment of dam safety monitoring automation in China

2003, 0 (6): 13-18   

Reviews on progresses of data analysis and information processing

2003, 0 (6): 19-23   

On working out dam safety monitoring index

2003, 0 (6): 24-28   

Special paper

Consideration on flood control end dam safety of hydropower stations

2003, 0 (6): 29-31   

Operation management

Research on crack resistance of mass concrete

2003, 0 (6): 32-34   

Analysis on dam safety inspection in Muguashan reservoir

2003, 0 (6): 35-37   

Data analysis

GPS ambiguity resolution using prior geometry information as quasi observation

2003, 0 (6): 38-41   

Monitoring analysis on concrete jointly loading of scroll case

2003, 0 (6): 42-44   

Monitoring on seepage for TGP’s left power plant building (non-spillway)monolith

2003, 0 (6): 45-47   

Monitoring automation

Application and prospect offiber-optic sensor in dam safety monitoring

2003, 0 (6): 48-51   

Theory of multi-faclors judgment applied in evaluating dam monitoring system

2003, 0 (6): 52-53   

Rehabilitation

Application of polyacrylic fibre netting concrete in Jinxiuchuan reservoir

2003, 0 (6): 54-55   

Rehabilitation of the Gutianxi Ⅲ dam

2003, 0 (6): 56-57   

Metal structure

Methods of safety testing and evaluation of hydraulic metal structures

2003, 0 (6): 58-61   

Analysis and comparison on fault wave recorders at home and abroad

2003, 0 (6): 62-64