Operation management

Influence of flood discharging rain and fog to operation of hydropower station and its counter-measures

2010, 0 (1): 1-4   

Discussion on aging process and expected life span of concrete dam

2010, 0 (1): 5-10   

Evaluation for the quality of reinforcement projects for defective reservoirs

2010, 0 (1): 11-14   

Analysis on the cause reason of cracks on the roller compacted concrete dam

2010, 0 (1): 15-18   

Monitoring technology

Some issues on the monitoring of stress-strain at concrete dams

2010, 0 (1): 19-27   

Fiber Bragg grating packaged by carbon fiber-reinforced plastic

2010, 0 (1): 28-30   

Data analysis

Several issues on data analysis of dam and engineering monitoring

2010, 0 (1): 31-35   

Application of empirical mode decomposition to horizontal displacement analysis and forecast of concrete dams

2010, 0 (1): 36-38   

Data analysis on cracks at transportation drainage gallery in spillway chamber at Lubuge dam

2010, 0 (1): 39-40   

Analysis on seepage and stability check of Qinghe reservoir dam

2010, 0 (1): 41-43   

Analysis on the monitoring data of inner deformation of Zeya reservoir dam

2010, 0 (1): 44-45   

Analysis on cause of cracks on Xiangshan cemented masonry gravity-arch dam

2010, 0 (1): 46-48   

Detection technology

Application of seismic CT for geological hazards detection in tunnels

2010, 0 (1): 49-52   

Application of carbon fiber cloth in reinforcement of the concrete structure at Ertan hydropower station

2010, 0 (1): 53-56   

Construction technology

Application of root pile and grouting technology in foundation reinforcement of the GIS building at Zilanba hydropower station

2010, 0 (1): 57-61   

Characteristics of the Bentonite waterproofing blanket and construction method

2010, 0 (1): 62-63   

Application of curtain grouting technology in seepage treatment of Gandjelas dam abutment

2010, 0 (1): 64-65   

Rehabilitation

Renovation of side water seal on radial gate of spillway at Lianhua dam

2010, 0 (1): 66-68   

Construction treatment for seepage of expansion joints at Shibanshui dam

2010, 0 (1): 69-71