• Data analysis • Previous Articles     Next Articles

Analysis on the monitoring data of inner deformation of Zeya reservoir dam

MA Qing-song, ZHOU Wang-jun, HUANG Ke-sheng and et al.   

  • Online:2010-02-28 Published:2010-02-28

泽雅水库大坝内部变形监测资料分析

麻青松1,周王俊1,黄克胜1,熊国文2   

  1. 1.泽雅水库管理站,浙江温州 325023;2.南京水利科学研究院,江苏南京 210029

Abstract: Analysis on the deformation monitoring data of Zeya reservoir dam was carried out, and logarithmic curve was adopted in statistical mode analysis of dam settlement.Further, the cause reasons for cracks on the face slab were presented.

摘要: 对泽雅水库运行10 年来的大坝变形监测资料进行了分析,采用对数曲线对坝体沉降进行了统计建模分析,并对面板受拉区出现裂缝原因进行了初步分析。