• Construction technology • Previous Articles     Next Articles

Application of curtain grouting technology in seepage treatment of Gandjelas dam abutment

JIANG Wei-chao and DENG Ying-ying   

  • Online:2010-02-28 Published:2010-02-28

帷幕灌浆技术在Gandjelas 大坝坝肩渗漏处理中的应用

姜卫超,邓莹莹   

  1. 中国水电十三局有限公司,山东德州 253009

Abstract: After the completion of Gandjelas dam construction, seepage of abutment above 1 529.80 m occurred when the water level was 1 545.0 m.Aiming at the seepage, curtain grouting on the dam abutment was carried out. The qualified rate in water pressure test was 100% and the collecting rate of drill core was high, which showed the grouting was of good effect.