Please wait a minute...

Current Issue

Discussion on grade and design standard for auxiliary dam of embankment type in hydropower station

2010, 0 (3): 1-3   

Design study

Quick optimization design of reinforcement section in front of gravity dam

2010, 0 (3): 4-6   

Operation management

Discussion on power generation regulation strategy at Yongxi III reservoir

2010, 0 (3): 7-9   

Study on the influence of frictional coefficient of cracks at concrete gravity dams

2010, 0 (3): 10-13   

Review of the earthquake relief at Futang hydropower station

2010, 0 (3): 14-19   

Analysis on the cause reason of cracks at Shuikou hydropower house

2010, 0 (3): 20-22   

Water regime forecasting

Renovation of the water regime forecasting system at Feilaixia hydro project

2010, 0 (3): 23-25   

Monitoring technology

Discussions on safety monitoring for high concrete face slab rock-fill dams

2010, 0 (3): 26-29   

Extraction of comprehensive information of dam foundation horizontal displacement based on Kalman filter fusion algorithm

2010, 0 (3): 30-34   

Application of RTK in town measurement

2010, 0 (3): 35-37   

Data analysis

Analysis and evaluation of monitoring data by plumb lines in early impoundment period of Xiaowan arch dam

2010, 0 (3): 38-41   

Analysis on the monitoring data of induced joints in early impoundment period of Xiaowan arch dam

2010, 0 (3): 42-45   

Application of the fuzzy mathematics in analysis of hydraulic structures’prototype data

2010, 0 (3): 46-51   

Analysis on stability of homogeneous earth dam of plain reservoir as water level sudden drawdown

2010, 0 (3): 52-55   

Structural stability analysis of Menlou reservoir main dam

2010, 0 (3): 56-58   

Construction technology

Comparison of joint grouting technology on arch dam domestic and abroad

2010, 0 (3): 59-61   

Brush treatment for the upstream face at a roller compacted concrete dam

2010, 0 (3): 62-66   

Metal structure

Cause analysis on the cavitation on the guide vane and its reshaping at the turbine No.2 of Changdian hydropower station

2010, 0 (3): 67-69   

Application of microcomputer excitation system in Baixi hydropower station

2010, 0 (3): 70-72   

Technology information overseas

Dam safety progress and challenges at Electricite de France

2010, 0 (3): 73-75   

Safety appraisal of old dams: an updated perspective

2010, 0 (3): 76-79