Analysis and lessons from typical failures of hydropower stations in China in recent years
WANG Huiyi and LIU Deming
Abstract1006)      PDF (320KB)(368)      
Water conservancy and hydropower projects have the characteristics of long construction period, complex structure, and being greatly affected by natural factors. An accidental factor in operation may sometimes lead to systematic safety accidents of the whole hydropower station. The author summarizes some typical cases of domestic hydropower station accidents in recent years, and analyzes some risk factors needing attention in the construction and operation management of hydropower stations, to provide reference for design, construction and operation management.
2022, 0 (6): 1-.
Stability analysis of the downstream slope on the right bank of lower reservoir of Zhouning pumped storage power station
NIU Zhengwei, PAN Bing and CHEN Dongdong
Abstract766)      PDF (497KB)(109)      
Based on the excavation and disclosure of the downstream slope of the right dam abutment of lower reservoir of Zhouning pumped storage power station in Fujian province, combined with analysis of structure characteristics of slope rock mass as well as the relationship between the structure planes and the excavation surface, traditional stereographic projection software is used to evaluate the stability of excavated slope. Moreover, two-dimensional modeling and analysis is carried out by use of discrete element program UDEC, and together with engineering geological conditions, the stability of excavated slope is comprehensively analyzed and evaluated. Without support, the safety factor of the potential rock composite of the slope under transient working conditions cannot meet the requirements from specifications. After completion of shallow support (including shotcrete, system anchor and anchor piles), the safety factor of the potential rock composite of the slope under transient working conditions can basically meet the requirements from specifications, but the safety margin is not high. The application of system anchor cable support has better control effect on the stability of the rock composite.
2020, 0 (6): 18-22.
Collection of typical cases of dam failures and accidents at hydropower stations
ZHANG Xiu-li
Abstract722)      PDF (311KB)(252)      
To compile the Guide for safety assessment of hydropower dams in operation, the author collected the cause reasons for the typical cases of dam failures and accidents at hydropower stations domestic and abroad. This paper presents 8 cases, for reference.
2015, 0 (1): 13-.
Review of tunnel failures at home and abroad and cause reasons
WANG Huiyi
Abstract482)      PDF (295KB)(215)      
During investigation, design, construction and operation of tunnels, due to constraints and mistakes, failures happen. There are 10 cases at home and abroad presented in this paper, as well as the cause reasons and the lessons learned, for reference.
2022, 0 (2): 14-.
Calculation of characteristic particle size and envelope of filter material in earth-rockfill dams
HE Xinhua, CAI Yongping and CAI Xiaohong
Abstract410)      PDF (240KB)(134)      
According to SL 274—2020 Design Code for Rolled Earth-rock Fill Dams, Sherard inverted layer design criteria are recommended. Based on the characteristic particle size of protected soil, the characteristic particle size of filter material and the envelope are calculated, and constraint condition for the closure and recovery of the crack in impervious body is presented, which make the inverted layer more reliable and reasonable.
2022, 0 (6): 23-.
Explanation on accuracy, precision and trueness and its application
HU Di-zhong and TAN Kai-yan
Abstract393)      PDF (258KB)(295)      
By comparison the definitions in regulations of the former Soviet Union and China, the term precision, accuracy and trueness are redefined. Different from accuracy and trueness, it can be quantified.
2017, 0 (5): 15-.
Leakage detection methods for reservoir dams
HUANG Shiqiang
Abstract350)      PDF (1032KB)(714)      
Leakage is common for reservoir dams which not only affects the project benefits, but also causes serious hidden risks, can even lead to a dam break. Locating the leakage and its passage is the basis for further treatment which is key to ensure the safe operation of reservoir dams. At present, there are many leakage detection methods with their own applicability and limitations, and are restricted by site condition, environmental condition and geological conditions. Suitable methods should be selected based on method characteristics and site conditions, to achieve better detection effect.
2021, 0 (2): 42-.
Analysis on monitoring precision by collimation line small angle method
FU Zhong-ming and PU Jiu-wu
Abstract341)      PDF (291KB)(175)      
Collimation method is most commonly used in monitoring of horizontal displacement of a dam. With the popularization and application of total station instead of theodolite, the total station is widely used for horizontal displacement monitoring with the collimation line small angle method. To ensure the accuracy, one or more intermediate stations should be added as the maximum length of the collimation line of concrete dam is more than 300 m, while the maximum length of the collimation line of earth dam is more than 500 m. The analysis and practice of segment monitoring shows that it is of high precision provided that the displacement monitoring precision of the intermediate station is well controlled.
2018, 0 (3): 42-.
Data structure design and system initialization for the dam safety monitoring and management information system - iDam#br#
FENG Tao, LI Zhongyuan and CHU Zhaowei
Abstract338)      PDF (373KB)(152)      
Data abstraction and structure design are the foundation of application system construction, which are related to the practicability, scalability and stability of the system. Before the application system is put into service, the necessary work flow is to initialize the system, create an instance of the management objects for the system, and then applications are implemented. This paper, taking dam safety monitoring and management information system - iDam as an example, elaborates its basic data structure design and implementation of initialization, for reference.
2022, 0 (4): 41-.
Application research of intelligent dispatching based on cascade hydropower stations in whole ba sin
QIAN Wei and SUN Jingying
Abstract336)      PDF (1273KB)(774)      
In order to realize the intelligent dispatching operation goal of cascade hydropower stations in
Nam Ou river basin in Laos, based on the management concept of digital transformation, this study ana lyzes the difficulties of overall dispatching for cascade hydropower stations, and explores the implemen tation path and effective measures to improve the accuracy of hydrometeorological prediction and the op eration and dispatching capability of hydropower stations. Through the intelligent dispatching of hydro power stations, the economic benefit, social benefit and ecological benefit are improved, and the goal of  carbon peaking and carbon neutrality is promoted. It can provide guidance and reference for hydropower  development along the Belt and Road and the cascade control centers in major river basins at home and
abroad.
2024, 0 (3): 1-4,14.
Enlightenment of safety management of hydropower dams under national water security strategy
ZHANG Xiuli
Abstract319)      PDF (354KB)(285)      
From the perspective of the role played by reservoir dams, the importance of reservoir dam safety to the realization of national water security strategy and dual carbon goals is emphasized. The safety operation of reservoir dams is always faced with severe situation and risks. By reviewing and summing up the safety supervision of hydropower dams, some suggestions are put forward.
2021, 0 (6): 1-.
Abstract287)      PDF (261KB)(144)      
Overview of transportation of major parts for Baihetan hydropower station
SONG Gangyun, CHEN Hao and DU Qingpin
Abstract283)      PDF (348KB)(149)      
Baihetan hydropower station has a huge installed capacity as well as large unit capacity, therefore, the transportation of major parts is one of the important tasks. Combined with the feasibility study of Baihetan hydropower station, the implementation of transportation of the major parts is introduced in this paper, for reference.
2021, 0 (3): 26-.
Discussion on failure modes of concrete dams and geometric parameters of dam break
by YANG Yanlong, SHEN Haiyao and HUANG Wei
Abstract279)      PDF (1664KB)(607)      
The calculation and analysis of dam break flood is an important basic work for dam risk assessment and emergency management. The size of dam break has a great impact on the calculation of dam break flood. At present, most research on the development of dam break is about earth rock dams, while the research on concrete dam break is less. So in the calculation of dam break flood, the geometric size of concrete dam break is usually assumed based on experience. According to the database of historical concrete dam break cases at home and abroad, combined with structural characteristics of concrete dams, the causes and failure modes of concrete dam break are counted and analyzed, and the general principle for estimating the size of concrete dam break is introduced, which provides a reference for determining the parameters of concrete dam break in flood calculation.
2022, 0 (3): 1-9.
Compilation of Guide for safety assessment of hydropower dams in operation
ZHANG Xiu- li
Abstract275)      PDF (253KB)(152)      
The paper introduces some issues about the compilation of Guide for safety assessment of hydropower dams in operation, including the origin of assignment, aim, principle and the process of the compilation, the data collection and investigation, the relation between this guide and other related regulations as well as the main contents.
2015, 0 (1): 1-.
Application scenarios and design points of dam safety video surveillance system
LI Qian and CHEN Kai
Abstract272)      PDF (350KB)(163)      

This paper describes the relationship between the dam safety video surveillance system and other systems, and summarizes the objects and contents to be monitored. Also, selection of right frontend device, communication, control, storage and display equipment based on the characteristics of hydropower dam and monitoring objects is introduced. In accordance with the principles of practicability, reliability, economy, advancement, maintainability expandability and upgradability, the dam safety video surveillance system is designed to meet the needs of dam safety management.

2022, 0 (6): 37-.
Development and application of new elastic epoxy coating
LIU Deming, WU Qimin, CHEN Qiao, YU Xun and SHAO Yimin
Abstract270)      PDF (483KB)(191)      
HK-968 elastic epoxy coating is modified by chemical toughening. It combines the elasticity of polyurethane materials with the strength and adhesion of epoxy materials. It cures at room temperature and has better durability on the concrete surface which exerts good effect on the treatment of difficult problems such as cavitation and abrasion damage of hydraulic structures. This paper introduces the development process of HK-968 elastic epoxy coating from the aspects including main agent selection,
performance tests and adjustments, durability tests and so on, and two application cases are presented, for reference.
2022, 0 (6): 67-.
Abstract266)      PDF (420KB)(916)      
Influence of blasting on the existing dam during the expansion of Chitan hydropower station
CHEN Nianhui, ZHENG Shuo and XU Defang
Abstract264)      PDF (551KB)(158)      
During the expansion of Chitan hydropower station, the blasting may affect the adjacent dam, powerhouse and switching station. In this paper, the important structures' dynamic response to blasting vibration is determined by three-dimensional dynamic finite element calculation. The results show that the safety of existing dam can be ensured by control of blasting parameters and by other protection measures in the process.
2021, 0 (6): 21-.
Analysis on consolidation grouting through guiding pipe for dam foundation of hydropower station
WEI Wanshan
Abstract257)      PDF (1402KB)(276)      
Consolidation grouting is very important for foundation treatment of hydraulic structures. The author mainly introduces the construction technology and related construction parameters of consolida-tion grouting through guiding pipe for dam foundation of hydropower station. It is proved by practice that the technology is feasible, economical and reasonable, and the grouting quality meets the requirements of design and specifications.