dam ›› 2015, Vol. 0 ›› Issue (1): 1-.

    Next Articles

Compilation of Guide for safety assessment of hydropower dams in operation

ZHANG Xiu- li   

  1. Large Dam Safety Supervision Center of National Energy Administration
  • Received:2015-01-20 Online:2015-02-08 Published:2015-02-08

《水电站大坝运行安全评价导则》编制情况说明

张秀丽   

  1. 国家能源局大坝安全监察中心,浙江 杭州,310014
  • 作者简介:张秀丽(1962- ),女,江苏扬州人,教授级高级工程师,总工程师,研究方向为水电站设计与大坝安全管理。

Abstract: The paper introduces some issues about the compilation of Guide for safety assessment of hydropower dams in operation, including the origin of assignment, aim, principle and the process of the compilation, the data collection and investigation, the relation between this guide and other related regulations as well as the main contents.

Key words: hydropower dam, operation assessment, guide, compilation

摘要: 介绍了《水电站大坝运行安全评价导则》编制的任务来源、制订目的和原则、必要性、制订过程、专题资料收集和调研情况、与国家有关大坝安全法律法规和电力行业安全鉴定的关系、与现行设计或施工规范的关系、主要内容等情况,以便应用者加深理解。