Please wait a minute...

Current Issue

2005 Vol.0, No. 3   Published: 28 June 2005
           
Operation management

Study on the ageing condition of concrete dam

2005, 0 (3): 4-8   

Analysis on the ageing of concrete dams

2005, 0 (3): 9-13   

Establishment of earthquake monitoring sub-station in Taipingwan hydropower plant

2005, 0 (3): 14-16   

Hydraulic management in Maojianshan hydropower station

2005, 0 (3): 17-18   

Operation and management on Wuluwati dam

2005, 0 (3): 19-21   

Flood analysis in Bikou reservoir

2005, 0 (3): 22-24   

Analysis on cracks and its development at the spillway tunnel in Luhun reservoir

2005, 0 (3): 25-27   

Design study

Stability computation on a structural rock mass of Qingshiliang ridge

2005, 0 (3): 28-30   

Study on early cracking resistant mechanical characteristics of fly-ash concrete

2005, 0 (3): 31-34   

Experiment on feasibility of filling grouting in the slope repair in Dalangdian dam

2005, 0 (3): 35-36   

Data analysis

Temporal-spatial displacement model of the crest deformation in Fengtan dam

2005, 0 (3): 37-40   

Analysis on the surface deformation of rockfill dam using distribution model

2005, 0 (3): 41-42   

Study on deformation of the left non-overflow dam No.8 in TGP

2005, 0 (3): 43-45   

Analysis on observed data during construction for impervious core in Duihekou dam

2005, 0 (3): 46-47   

Rehabilitation

Treatment for dam slab defects in Tianshengqiao-1 dam

2005, 0 (3): 48-50   

Treatment for dam slab defects in Tianshengqiao-1 dam

2005, 0 (3): 51-53   

Seepage treatment in the gallery at the El.888.8m in Wanjiazhai dam

2005, 0 (3): 54-55   

New technology on watertight seal and frost prevention application in Lotus dam

2005, 0 (3): 56-58   

Analysis on the cracks in the T beam at the access bridge in Gutianxi I dam

2005, 0 (3): 59-61   

Application of composite fiber with high intension to repair concrete member

2005, 0 (3): 62-63   

Anti-seepage treatment at the dam foundation in Andi reservoir

2005, 0 (3): 64-65   

Technology of digging and mixing cement-soil impervious thin cutoff wall

2005, 0 (3): 66-68   

Using high pressure grouting technology for reinforcing Huangshilong reservoir

2005, 0 (3): 69-70   

Application of tide-time available chart on construction of Hongda sea embankment

2005, 0 (3): 71-72   

Metal structure

Anti-corrosion methods for metal structures used in Gezhouba hydro project

2005, 0 (3): 73-76