• Operation management • Previous Articles Next Articles
LIANG Zhi-hai
Published:
梁志海
Abstract: Taipingwan power plant built an earthquake monitoring sub-station and keeps the station updated as part of the earthquake prevention. The advanced monitoring equipment and installation sites are well selected. All monitoring equipment are preapproved by the National Earthquake Bureau of China. As a part of prevention, the knowledge of earthquake and damage control is well advertised to the public. The regulations and rules of corresponding authorities are well followed and enforced. The prevention work principle is well and intensively prepared internally, but not cause general public to be panic.
摘要: 太平湾电厂通过地震监测子台建设和改造,积极开展地震预防性工作,选择符合国家地震局技术要求的先进监测仪器和监测安置地点。广泛宣传防震减灾知识,认真贯彻上级政策和法规,始终坚持内紧外松,疏而不漏的原则。
梁志海. 太平湾电厂地震监测子台的建设与运用[J]. .
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://magtech.dam.com.cn/EN/
http://magtech.dam.com.cn/EN/Y2005/V0/I3/14