2007 Vol.0, No. 3   Published: 28 June 2007
           
Design study

Hydraulic research and design optimization of the diversion systemat Jinping Ⅱ hydropower station

2007, 0 (3): 1-7   

Brief introduction to the gate hoist at New dam ship lock

2007, 0 (3): 8-10   

Temperature control simulation analyses on heightening project for Songyue reservoir

2007, 0 (3): 11-15   

Operation management

Dam safety management: the challenge of PFMs and the opportunity of a PFMA

2007, 0 (3): 16-21   

EPP compilation for Xin’anjiang dam

2007, 0 (3): 22-24   

Cause analysis of underwater concrete corrosion at Shaxikou hydropower station

2007, 0 (3): 25-27   

Monitoring technology

Recorded performance appraisal of Shanxi concrete face- slab rockfill dam

2007, 0 (3): 28-32   

Design of data management module for monitoring information management system

2007, 0 (3): 33-35   

Data analysis

Seepage prevention scheme and effect analysis of Tai’an pumped storage power station

2007, 0 (3): 36-38   

Rehabilitation

Construction of setting key- way on jointing surface between newand existing concrete

2007, 0 (3): 39-41   

Treatment to the crack on the secondary damcrest of Lianhua hydropower plant

2007, 0 (3): 42-44   

Application of epoxy material in reinforcement of the draft- tube concrete defect of Baozhusi hydropower plant

2007, 0 (3): 45-48   

Coupling effect analysis of destruction of Yuling thin core wall and mechanism of spitting grouting

2007, 0 (3): 49-52   

Metal structure

Principle and fault analysis of the duplex hydraulic hoist at Ertan hydropower plant

2007, 0 (3): 53-55   

Application of automatic gate lifting control system in Fengjiashan reservoir

2007, 0 (3): 56-58   

Underwater anti- corrosion coating technology

2007, 0 (3): 59-62   

New application of liquid soft starter

2007, 0 (3): 63-65