Please wait a minute...

Current Issue

Design study

Study on mix proportion design of slab concrete of Bailianhe hydropower station

2007, 0 (2): 1-4   

Difference resolution to pressure seepage in anomalous region

2007, 0 (2): 5-8   

Operation management

Consideration on EPP for sudden events of dams

2007, 0 (2): 9-11   

Application of flood analysis result of Three Gorges reservoir in reservoir operation

2007, 0 (2): 12-15   

Periodical gate daminspection of Yingxiuwan hydropower station

2007, 0 (2): 16-19   

Research on the status quo and sustainable utilization measures of large and medium- sized reservoirs in Guangdong province

2007, 0 (2): 20-24   

Safety management of hydraulic structures at Baozhusi hydropower plant

2007, 0 (2): 25-27   

Analysis on influence of water and sediment regulation to deformation at Xiaolangdi dam

2007, 0 (2): 28-31   

Discussion on adding rapid release culvert at medium and small- sized reservoirs

2007, 0 (2): 32-34   

Monitoring technology

Some problems in dam deformation monitoring by surveying

2007, 0 (2): 35-37   

Discussion on arrangement of monitoring instruments at concrete face rockfill dams

2007, 0 (2): 38-42   

Renovation of automatic external deformation monitoring system of Lianhua dam

2007, 0 (2): 43-46   

Implement and application of the wire alignment system at Xinfengjiang dam

2007, 0 (2): 47-50   

Data analysis

Seepage - prevention effect of dam foundation grouting at Shengzhong reservoir

2007, 0 (2): 51-53   

Construction technology

Development of bump- proof early- warning programfor large construction equipments

2007, 0 (2): 54-56   

Application of steel tube shear pile in right foreshore slope rehabilitation at Dongfeng dam

2007, 0 (2): 57-60   

Expansion joint asphalt well heating and grouting construction at Wanjiazhai dam

2007, 0 (2): 61-62   

Study on experimental grouting to earthquake accumulative dam in Xiaonanhai reservoir

2007, 0 (2): 63-70   

Rehabilitation

Carbon fiber sheets applied in hoister bent frame reinforcement in Jiangkou dam

2007, 0 (2): 71-73   

Rehabilitation of the No. 1 diversion tunnel at Lianhua hydropower station

2007, 0 (2): 74-76   

Application of high pressure grouting cutoff wall in seepage treatment at Qiyi reservoir dam

2007, 0 (2): 77-79   

Metal structure

Research on anti- erosion technology of hydraulic metal structures in Gezhouba project

2007, 0 (2): 80-83