• Rehabilitation • Previous Articles     Next Articles

Treatment to the crack on the secondary damcrest of Lianhua hydropower plant

LI Mu- sen   

  • Online:2007-06-28 Published:2007-06-28

莲花水电站二坝坝顶路面裂缝处理

李慕森   

  1. 牡丹江水力发电总厂, 黑龙江牡丹江 157000

Abstract: This paper introduced the inspection, cause reasons of the crack on the secondary dam crest, as well as the treatment measures.

摘要: 介绍了莲花水电站二坝坝顶路面裂缝检测、成因分析和处理方案。