Please wait a minute...

Current Issue

2021 Vol.0, No. 5   Published: 08 October 2021
           

Calculation and analysis of the hydraulic transition process in long pipes with high head of a pumped storage power station#br#

WANG Shengjun, WANG Caipin, DONG Zhengmiao and QIU Weixin

2021, 0 (5): 1-   

Research on calculation method for geomembrane anchorage in a whole reservoir seepage prevention project in Middle East#br#

ZHANG Xian and LUO Shujing

2021, 0 (5): 6-   

Planning of temporary automatic monitoring system during construction of underground powerhouse caverns of Shuangjiangkou hydropower station#br#

PENG Tao and WEN Hao

2021, 0 (5): 10-   

Optimization of temperature control and crack prevention measures for the concrete of a roller compacted concrete arch dam#br#

ZHANG Guozhi, WANG Juan, WANG Zhenhong, XIN Jianda and LI Hui

2021, 0 (5): 15-   

Study on the model for evaluation of the relationship between dam risk level and government decision-making#br#

ZHOU Kefa and WANG Le

2021, 0 (5): 20-   

Research on claim opportunity identification based on cost and schedule analysis in international hydropower projects#br#

CHEN Zhen, XIAO Bian, YAO Yating and MA Jialie

2021, 0 (5): 24-   

Application of active anti-UAV defense system in terrorism prevention system for hydropower station#br#

DAI Chenmengzi and HU Chao

2021, 0 (5): 28-   

Back analysis of temperature stress of RCC arch dam based on measured data

ZHU Mingdi, WANG Zhenhong, WANG Juan and ZHAO Yiming

2021, 0 (5): 32-   

Analysis on seepage through plugs in construction branch tunnel of a pumped storage power station#br#

XU Yihuang, TENG Shimin and LE Lixia

2021, 0 (5): 38-   

Analysis of seepage from Zoumazhuang auxiliary dam of Miyun reservoir after South-to-North water diversion project#br#

WANG Mo, ZHAO Xu, GAO Hailing and ZHANG Kunlun

2021, 0 (5): 42-   

Application of 3D laser point cloud in tunnel defect detection

YANG Wei, SHI Fuqiang, ZHANG Yiying, WANG Lijuan and LU Xiangxiang

2021, 0 (5): 46-   

Technology for detection of relaxation of surrounding rock of roof arch in underground powerhouse of hydropower station and its application#br#

LIU Zhihong, SUN Lican and QIN Jingjun

2021, 0 (5): 52-   

Application of seismic reflection wave method combined with side-scan sonar method to inspection of riprap revetment of Yangtze river#br#

LIU Dongfeng, LI Jinrui and GAO Jianhua

2021, 0 (5): 56-   

Study of safety management system of hydropower dams in Brazil

YANG Ge, FANG Luomin and FU Chunjiang

2021, 0 (5): 62-   

Public assistance for dams——eligibility and implementation outline

Federal Emergency Management Agency

2021, 0 (5): 69-