Dam & Safety ›› 2021, Vol. 0 ›› Issue (5): 6-.

Previous Articles     Next Articles

Research on calculation method for geomembrane anchorage in a whole reservoir seepage prevention project in Middle East#br#

ZHANG Xian and LUO Shujing   

  1. PowerChina Huadong Engineering Co., Ltd.
  • Received:2021-05-30 Revised:2021-07-22 Online:2021-10-08 Published:2022-01-10

中东某全库盆防渗工程土工膜锚固计算方法研究

张  弦,罗书靖   

  1. 中国电建集团华东勘测设计研究院有限公司,浙江  杭州,311122
  • 作者简介:张 弦(1991— ),男,浙江余姚人,硕士,工程师,主要从事水工建筑物结构研究。

Abstract: This paper introduces the anchorage design of the whole reservoir seepage prevention by geomembrane of a pumped storage power station in Middle East, sums up the calculation process of the anchorage groove, and presents relevant parameters, to provide reference for geomembrane anchorage design of similar overseas projects.

Key words: geomembrane, whole reservoir geomembrane seepage prevention, anchorage design, overseas project

摘要: 介绍中东某抽水蓄能电站工程下水库土石坝全库盆土工膜防渗锚固设计。对锚固槽锚固计算过程进行归纳总结,给出相关参数取值参考,为类似工程的土工膜锚固设计提供借鉴。

关键词: 土工膜, 全库盆防渗, 锚固设计, 海外工程

CLC Number: