Please wait a minute...

Current Issue

Design study

Design for carbon fibre into rehabilitation of GutianxiⅡ Hydropower Station

2003, 0 (4): 1-3   

Finite element analysis of miter gate of shiplock

2003, 0 (4): 4-6   

Operation management

Study on downstream scouring dents of Chencun Arch Dam

2003, 0 (4): 7-10   

Risk analysis on dam overtopping of Taihe Reservoir

2003, 0 (4): 11-14   

Measures on anti-freezing for spillway gates of Xiaogangou Dam

2003, 0 (4): 15-15   

Experience in dam safety management of Tianshengqiao I Hydropewer Station

2003, 0 (4): 16-18   

Analysis on safety status of Shiquan Dam

2003, 0 (4): 19-20   

Reservoir regulation

Necessity and feasibility of increasing flood control level of Wenyuhe Reservoi

2003, 0 (4): 21-23   

Analysis on flood and real-time reservoir dispatching of Kezhi’er Reservoir

2003, 0 (4): 24-27   

Introduction to autmnatie regimen forecasting system of Wanyao Reservoir

2003, 0 (4): 28-30   

Monitoring automation

Data acquisition synem in Xiaolangdi Project

2003, 0 (4): 31-33   

Review on safety monitoring system of Hunanzhen Dam and its improvement

2003, 0 (4): 34-35   

Data analysis

Application of multiple-factor static gray model into dam monitoring

2003, 0 (4): 36-38   

Safety analysis on dam seepage in Huangpo Reservoir

2003, 0 (4): 39-41   

Analysis on cracks in gallery roof of BL11of Gutianxi Ⅳ Dam

2003, 0 (4): 42-43   

Rehabilitation

Simulating test of float closing gate for underwater automatic positioning

2003, 0 (4): 44-46   

Analysis on cracks in bituminous concrete incline core of Niutoushan Reservoir

2003, 0 (4): 47-48   

Leakage treatment for contraetion joints of Lishimen Arch Dam

2003, 0 (4): 49-50   

Metal structure

Study on the head loss of trashrack of intake in hydropower stations

2003, 0 (4): 51-54   

On parallel connection capacitor setup of generator circuit breaker in enlarged unit connection

2003, 0 (4): 55-56   

Fox overseas

Protection dam strategy against terrorism in USA

2003, 0 (4): 59-61