Please wait a minute...

Current Issue

Operation management

Operation and management of Daguangba dam

2008, 0 (5): 1-4   

Analysis on the process and key technique of emptying high-pressure pipeline in pumped storage power station (PSPS)

2008, 0 (5): 5-9   

Stability analysis on abutment cracks at two single supporting pier solid-head buttress dams

2008, 0 (5): 10-15   

Design of flood prevention scheme of reclamation projects in construction

2008, 0 (5): 16-18   

Study on the structure of remote dam health diagnose system

2008, 0 (5): 19-21   

Monitoring technology

Reconsideration of several issues on automation in dam deformation monitoring

2008, 0 (5): 22-25   

Data analysis

Analysis on vertical deformation distribution model for permanent shiplock of Three Gorges project

2008, 0 (5): 26-28   

Analysis on safety monitoring result of rock-anchored bridge crane beam loading test

2008, 0 (5): 29-32   

Application of dam piezometer pipe data analysis in seepage safety assessment of Beixingjia reservoir

2008, 0 (5): 33-36   

Seepage analysis on the east main dam of Tangpu reservoir

2008, 0 (5): 37-38   

Construction technology

Application of high-pressure jet grouting in Fuan dike piping treatment

2008, 0 (5): 39-41   

Study on high-pressure jet grouting wall project at right abutment of Laohe reservoir

2008, 0 (5): 42-44   

Detection technology

Joint diagnosis of the seismic CT method and high density resistivity survey method for geological structure of Changkou tunnel

2008, 0 (5): 45-47   

The behavior of PHC pipe piles under lateral load by different shallow foundation treatment methods

2008, 0 (5): 48-53   

Rehabilitation

Seepage treatment of right bank spillway tunnel at Lubuge hydropower station

2008, 0 (5): 54-55   

Analysis on anti-earthquake liquefaction and treatment of Shifosi dam foundation

2008, 0 (5): 56-60   

Applications of reinforced geogrid in rehabilitation of Qingfengling reservoir main dam

2008, 0 (5): 61-64