Please wait a minute...

Current Issue

2013 Vol.0, No. 1   Published: 01 March 2013
           

Research and design of anti-seismic safety of Nuozadu high core wall rock-fill dam

2013, 0 (1): 1-4   

First operation with 270m water level of Xiaolangdi reservoir and discussion on the water level in the next stage

LI Li-gang

2013, 0 (1): 5-8   

Problems of spillway of Qinghe reservoir and its stability analysis

ZHANG Hai-jun, JIANG Feng-hai, JIANG Feng-wei

2013, 0 (1): 9-   

Settlement monitoring of Hadashan homogeneous earth dam by the cascading soil displacement meter

LI Ke-mian, MA Hong-liang, PENG Li-bin, GAO Yin

2013, 0 (1): 13-   

Application of TS30 Total Station in external deformation monitoring of Nanshui dam

WANG Li-yang, WEI Wei-ming, ZHANG Wei-hua, WEI Jian-dong

2013, 0 (1): 17-   

Dam monitoring sensor based on the intelligent identification technology

ZHU Jin-feng, XU Si-chen and XU Gang

2013, 0 (1): 21-   

Analysis on monitored temperature of Dachaoshan dam

ZHANG Ji, CAI Ming, DENG Hai-long

2013, 0 (1): 25-   

Review of non-destructive detection for hidden defects of dams

ZHANG Hui, YANG Tian-chun

2013, 0 (1): 29-   

Discussion on detection technology for hidden defects of dams

DONG Yan-peng, LIU Li-zhen, GU Hong-ying

2013, 0 (1): 35-   

Leakage detections for embankment dams based on high-density resistivity method

SONG Zi-long, WANG Xiang, HUANG Bin

2013, 0 (1): 38-   

Construction technology and temperature control of concrete volute of Xiluodu powerhouse

CHEN Zhi-huan

2013, 0 (1): 42-   

Application of rock-fill concrete in Qingyu reservoir

SHEN Huan-zhen

2013, 0 (1): 48-   

Concrete surface defects repair of cushion pool of a hydropower station

YUE Ming-tao, LI Yan

2013, 0 (1): 51-   

Effect test of application of high pressure jet grouting in anti-seepage rehabilitation

WANG Zhen-kai, ZHENG Xian-ling

2013, 0 (1): 56-   

Application of three-pipe high pressure jet grouting in anti-seepage rehabilitation of Wenquan reservoir

JIANG Bo, LI Jin-qing, MO Hong-yan

2013, 0 (1): 59-   

Risk assessment required in the framework of new French regulation on dams——Methodology developed by INERIS

CUI Hong-yi

2013, 0 (1): 63-