dam ›› 2013, Vol. 0 ›› Issue (1): 56-.

Previous Articles     Next Articles

Effect test of application of high pressure jet grouting in anti-seepage rehabilitation

WANG Zhen-kai, ZHENG Xian-ling   

  • Received:2012-10-18 Online:2013-03-01 Published:2013-03-01

高喷灌浆在水库防渗加固中的效果检查方法

王祯凯,郑贤岭   

  1. 中国水电一局有限公司,辽宁 旅顺116041
  • 作者简介:王祯凯(1976-),男,河北吴桥人,副总工程师,一直从事基础处理项目管理工作。

Abstract: High pressure jet grouting is widely used in seepage prevention and rehabilitation projects recently. But, the effect test method is not satisfactory yet. By summary of practical experience, comprehensive analysis method is advanced in this paper. The method is effective and reliable in effect test and assessment, worthy reference.

Key words: high pressure grouting, reservoir, rehabilitation, effect test, comprehensive analysis

摘要:

高压喷射灌浆作为一种行之有效的防渗措施,在水库除险加固中的应用越来越多,对其防渗效果的检查显得尤为重要。目前常用的一些检测方法往往达不到满意的效果,这是当前防渗加固工程中的一个薄弱环节,有待进一步改进。在总结以往经验的基础上,提出综合分析方法,并对防渗效果进行检查和评估。

关键词: 高压灌浆, 水库, 除险加固, 效果检查, 综合分析