Analysis on dam safety emergency of concrete face-slab rockfill dams

SHEN Jing and MENG Xiangjun

2020, 0 (2): 1-   

Summary and reflection on construction management of the damage repair project of Qingjiang cascade hydropower stations

WU Daocang and GONG Jianbing

2020, 0 (2): 5-   

Innovation and practice of lifecycle management of safety monitoring information of Shuangjiangkou hydropower station

PENG Tao and WU Yuanlong

2020, 0 (2): 10-   

Discussion on stability analysis methods for the slope with weak intercalation

CHEN Guo? liang, ZHOU Renjie, LUO Shujing, ZHANG Xian and WANG Ailin

2020, 0 (2): 14-   

Application of LSPIV flow field measurement system in hydraulic prototype observation of dam spillway

ZENG Yongjun, YAN Genhua, SHI Xianrui, SUN Yunxi and ZHU Chunyue

2020, 0 (2): 19-   

Selection of earth- rock dam types for Yulong Kashi water conservancy project in Xinjiang

YUAN Lei and MA Hongyu

2020, 0 (2): 25-   

Research and application of unified observation coordinates in dam horizontal displacement monitoring project in Yalong river basin

LI Xiaoxiao, ZHANG Chen and FENG Yongxiang

2020, 0 (2): 33-   

Application of CFD three-dimensional flow field numerical simulation technology for TBM assemble cavern at Jinping Ⅱ hydropower station

WU Jiang and ZHANG Ting

2020, 0 (2): 38-   

Study on mechanical characteristics of cushion spiral case structure in a hydropower station

LIU Minghua, HONG Jiamin, NI Shaohu, LV Kang and ZHENG Haisheng

2020, 0 (2): 42-   

Influence of the surge caused by reservoir bank landslide on arch dam safety

YAO Mengdi

2020, 0 (2): 46-   

Research and engineering practice of new materials for improving the bonding strength on concrete bonding interface

TAN Kaiyan

2020, 0 (2): 52-   

Application of fair-faced concrete construction technology in underground powerhouse of hydropower station

YANG Chunxu

2020, 0 (2): 58-   

Application of frost- resistant and non-dispersible concrete and epoxy anti-corrosion coating in repair of the tail sluice pier of Wanjiazhai hydro project

WANG Guopeng and MU Wenyong

2020, 0 (2): 65-   

Analysis on seepage treatment of Xin'anjiang dam and its effect

ZHAO Xinhua

2020, 0 (2): 69-   

Reason analysis and treatment scheme of the second stage concrete defects at gate slot of Tankeng hydropower station

ZHU Fuxing, LU Linjing and LIU Yuancai

2020, 0 (2): 73-