Please wait a minute...

Current Issue

2005 Vol.0, No. 1   Published: 28 February 2005
           
Monitoring automation

Introduction to the dam safety monitoring automation system in Cheneun hydropower plan

2005, 0 (1): 32-34   

On operation ofdam monitoring automation system in Shisanling Pumped storage station

2005, 0 (1): 35-37   

Automatic monitoring system of Yunfeng dam

2005, 0 (1): 38-40   

Data analysis

Load-beating performance change of concrete dams based on its observed data

2005, 0 (1): 41-45   

Study on the stability against sliding for dam block on low-angle fault in Yunfeng dam

2005, 0 (1): 46-51   

On conversion stress numerical value of strain gauge

2005, 0 (1): 52-54   

Osmotic pressure data analysis on foundation of Lixi gate darn

2005, 0 (1): 55-56   

Rehabilitation

GPR detection study on slope slide disease due to earthquake in Shuangshusi reservoir

2005, 0 (1): 57-59   

Experiment study on clay shale reinforcement at BL2 and BL3 in Xin’anjiang dam

2005, 0 (1): 60-63   

Spray technology of polyurea elastomer and its application in hydraulic projects

2005, 0 (1): 64-66   

Management on excavating silt at the tailrace tunnel in Taipingwan hydropower station

2005, 0 (1): 67-69   

On design of reinforcement for Changsha dam

2005, 0 (1): 70-72   

Reinforcement for conduit pipe of Shimen reservoir

2005, 0 (1): 73-75   

Analysis on the seepage condition and its anti-seepage treatment in Baishan reservoir

2005, 0 (1): 76-78