• Rehabilitation • Previous Articles
LIU Ming-jiang and HUANG Zhi-gang
Published:
柳明江,黄志刚
Abstract: The seepage in dam foundation in Baishan reservoir has been analyzed in detail from many aspects, including underground water outcropping, icing on the surface of reservoir, geological condition of dam foundation and the geophysical detection results, sediment and so on. The seepage reason is concluded and based on which the treatment method has discussed.
摘要: 从白山水库坝下游地下水出露现象、水库水面结冰现象、坝基地质情况及物探检测结果、沉积条件等多个方面对水库坝基渗漏情况进行了详细分析。根据分析得出了渗漏原因,并探讨了防渗处理方法。
柳明江,黄志刚. 白山水库坝基渗漏情况分析及防渗处理探讨[J]. .
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://magtech.dam.com.cn/EN/
http://magtech.dam.com.cn/EN/Y2005/V0/I1/76