2002 Vol.0, No. 2   Published: 28 April 2002
           
Special paper

Analysis of behavior of sludge frorn8 dam sites in southern China

2002, 0 (2): 8-11   

Design study

Definition on construction diversion standard and type of division structure of Lingjintan Project

2002, 0 (2): 12-15   

Operation management

On check and acceptance of hydraulic structures oi Xiaolangdi Project

2002, 0 (2): 16-17   

Study of automatic hoisting trashrack before inlet of Hunazhen Reservoir

2002, 0 (2): 18-19   

Study of using rock riprap as kentledge to crush sludge in Bashan Reservoir

2002, 0 (2): 20-21   

Flood control

Research on applied decision-making consultation about venture dispatch of Nanwan Reservoir

2002, 0 (2): 22-25   

Monitoring

Discussion on some technical problems of the automatic system design for dam safety monitoring

2002, 0 (2): 26-27   

Using method of intersection to observe deformation of buildings and accuracy assessement

2002, 0 (2): 28-31   

Data analysis

Analysis of structural state for the block No.3 of Ansha Dam

2002, 0 (2): 32-35   

Seepage and stability analysis of embankment of Wuling Reservoir

2002, 0 (2): 36-38   

Rehabilitation

Rehabilitation for defects under water in hydraulic structure of Qingtongxia Hydropower Station

2002, 0 (2): 39-43   

Study of rehabilitation measures taken in the discharge structure of Liujiaxia Hydropower Station

2002, 0 (2): 44-46   

Necessity for modification of rubber dam in Lucun Reservoir

2002, 0 (2): 47-48   

Gate testing

Analysis on safety conditions of hydraulic steel gates and hoists of some hydropower stations

2002, 0 (2): 49-51   

Eroaion detection methods for hydraulic metal structures

2002, 0 (2): 52-54