Please wait a minute...

Current Issue

Experiment study

Investigation to system reliability of gravity dam with weak intercalary strata

2006, 0 (2): 1-3   

Hydraulic model experiment in Jiangya dam

2006, 0 (2): 4-6   

Operation management

Discussion on damstrong earthquake monitoring and earthquake damage warning

2006, 0 (2): 7-10   

Practice of forced excavation discharge in reservoir emergency preparation

2006, 0 (2): 11-12   

Development of Qingshan reservior real - time safety dispatching system

2006, 0 (2): 13-16   

Deposit analysis on Bashan reservoir and its mitigation scheme

2006, 0 (2): 17-20   

Analysis on Dumen damfailure in Beiliu city and its reinforcement

2006, 0 (2): 21-22   

Monitoring automation

Research and manufacture on AMSDD- SRBG and its application

2006, 0 (2): 23-27   

Industrial television design on supervisory system used in Xi'ni'er reservoir

2006, 0 (2): 28-30   

Material study

Site tests of elasticity epoxy mortar on the spillway of Xin'anjiang hydropower dam

2006, 0 (2): 31-34   

Construction technology

Construction technology on concrete cutoff wall of lower reservoir in Tai'an pumped storage station

2006, 0 (2): 35-37   

Detection technology

Videotaping detection technology in turbid water and its application

2006, 0 (2): 38-39   

Application of high- density resistivity technique to caves of dam

2006, 0 (2): 40-42   

Rehabilitation

Discussion on estimating the blind hole during chemical grouting

2006, 0 (2): 43-44   

Detection and treatment on surface cracks at piers of upper outlets in Shiquan dam

2006, 0 (2): 45-47   

Introduction on rehabilitation of Tangcun reservoir

2006, 0 (2): 48-50   

Application of concrete cutoff wall to the rehabilitation of Yongji reservoir

2006, 0 (2): 51-53   

Metal structure

Research on sluice safety monitoring and reliability evaluation

2006, 0 (2): 54-58