Design study

Structure design of heightening for Songyue RCC dam

2006, 0 (3): 1-5   

Operation management

Opertation and management of Bikou dam

2006, 0 (3): 6-8   

Technology of flood forecast applied in Meizhou reservoir

2006, 0 (3): 9-12   

Overview of dam safety operation management of Jilihe reservoir

2006, 0 (3): 13-16   

Monitoring technology

Discussion on use error of hydraulic monitoring sensor index

2006, 0 (3): 17-20   

Owner’s control on modification of Dahuofang reservoir monitoring automation

2006, 0 (3): 21-24   

Construction of seepage automatic monitoring system of Zhangze reservoir

2006, 0 (3): 25-27   

Construction technology

Crack treatment at the ash-ward face of Zishan ash dam

2006, 0 (3): 28-30   

Precast concrete flume and its installation of Santunhe channel head

2006, 0 (3): 31-32   

Detection technology

Reservoir cross-sectional survey in Ertan hydropower station

2006, 0 (3): 33-37   

Detection of seepage cut-off wall of Wangjiaba sluice foundation

2006, 0 (3): 38-40   

Application of physical detection into crack detecting of concrete anti-seepage wall

2006, 0 (3): 41-43   

Rehabilitation

Rehabilitation of GutianxiⅡdam

2006, 0 (3): 44-46   

Foundation leakage treatment and its result of Shangyoujiang dam

2006, 0 (3): 47-49   

Application of low elastic modulus concrete anti-seepage wall in embankment dams

2006, 0 (3): 50-52   

Sand shell vibroflotation strengthening of Andi reservoir dam

2006, 0 (3): 53-55   

Application of high pressure spary grouting technology in reservoir rehabilitation

2006, 0 (3): 56-60   

High pressure spray grouting into anti-seepage wall of Huihe reservoir dam

2006, 0 (3): 61-63   

Leakage cause of small reservoir dams and their treatment technology

2006, 0 (3): 64-65