Please wait a minute...

Current Issue

Operation management

Division of diversion stages and flood control for high dams with large reservoir

2012, 0 (3): 1-5   

Influence of Wenchuan Earthquake on three dams and rehabilitation

2012, 0 (3): 6-10   

Design and construction of integrated automation system for Lishimen reservoir

2012, 0 (3): 11-13   

Monitoring technology

Discussion on some issues in application of double-metal marks

2012, 0 (3): 14-19   

Application of monitoring technology in load test of the crane beam in underground powerhouse

2012, 0 (3): 20-24   

Application of hydrostatic leveling system in deformation monitoring of Huanglongtan dam

2012, 0 (3): 25-29   

Data analysis

Investigation on divisional inversion of dam mechanic parameters based on improved PSO algorithms

2012, 0 (3): 30-34   

Analysis on seepage stability and safety evaluation of Yuling Spring artificial lake project

2012, 0 (3): 35-38   

Monitoring instrument

Design of GPS-based real-time dam deformation monitoring system

2012, 0 (3): 39-41   

Water level monitoring system at Jiangxia tidal power station

2012, 0 (3): 42-44   

Construction technology

Technology and quality control in construction by jackup slipform for spillway pier concrete of Guandi hydropower dam

2012, 0 (3): 45-48   

Rehabilitation

Evaluation on the effect of rehabilitation of Shuidong dam

2012, 0 (3): 49-51   

Monitoring of cracks on the guide wall of block No. 7 of Hunanzhen dam and treatment

2012, 0 (3): 52-55   

Damage on penstock of Guankan hydropower station and its repair

2012, 0 (3): 56-57   

Technology information overseas

Research on dam breach modeling in extreme flood processes

2012, 0 (3): 58-62   

Flood propagation in extreme flood processes

2012, 0 (3): 63-68