Dam & Safety ›› 2026, Vol. 0 ›› Issue (5): 28-.

Previous Articles     Next Articles

Analysis of the operational behavior of 200-meter-class concrete gravity dams

NIE Guangming   

  1. Large Dam Safety Supervision Center, National Energy Administration
  • Received:2026-06-16 Online:2026-10-08 Published:2026-10-28

200 m 级混凝土重力坝运行性态分析

聂广明   

  1. 国家能源局大坝安全监察中心,浙江  杭州,311122
  • 作者简介:聂广明(1963— ),男,甘肃会宁人,正高级工程师,从事大坝安全评价工作。

Abstract: This paper analyzes and summarizes the operational behavior of four 200-meter-class concrete gravity dams in China. The results indicate that the deformation, seepage, and foundation stresses of these four ultra-high dams are generally normal, and local seepage defects in the dam body and foundation do not yet affect the normal operation of the dams. This study can serve as a reference for the operational management of similar high dams.

Key words: concrete gravity dam, deformation, seepage, foundation stress

摘要: 对我国4座200 m级混凝土重力坝运行性态进行分析总结,结果表明4座超高坝的变形、渗流和坝基应力总体正常,坝体、坝基局部渗流缺陷尚不影响大坝正常运行,可为同类高坝运行管理提供参考。

关键词: 混凝土重力坝, 变形, 渗流, 坝基应力

CLC Number: