• Construction technology • Previous Articles Next Articles
JIN Yi and YANG Mei-ping
Online:
Published:
金毅1,杨梅萍2
Abstract: This paper introduced the dry construction process by application of steel casing to install pile cap underwater. As well, with help of guide-bar, the method and experience of how to control the position of well-shaped track beams of slipway of berth accurately were presented here.
摘要: 介绍了某船台滑道工程采用钢护筒干法施工水下桩帽,利用导杆法精确控制水下滑道“井”字形轨道梁安装位置的具体做法及相关体会。
金毅,杨梅萍. 大型预制构件水下高精度安装施工控制技术[J]. .
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://magtech.dam.com.cn/EN/
http://magtech.dam.com.cn/EN/Y2011/V0/I6/29