• Reservoir regulation • Previous Articles Next Articles
JIN Jian-le
Online:
Published:
金建乐
Abstract: It took ten years to construct the automatic measurement and reporting system of Jinshuitan hydropower plant since 1994. Through the improvement and perfection for many years, the stability and adoptability of the system has been greatly increased and has made a great contributions to the flood control work of the plant. In this paper the establishment and operation of automatic measurement and reporting system are introduced in detail.
摘要: 紧水滩水电厂水情自动测报系统白1994年建设至今已有10年。通过多次的改造和完善,系统的稳定性和实用性得到了大幅提高。本文就紧水滩水电厂水情自动测报系统的建设和运行情况进行分析。
金建乐. 紧水滩水电厂水情自动测报系统的建设和运行[J]. .
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://magtech.dam.com.cn/EN/
http://magtech.dam.com.cn/EN/Y2005/V0/I2/49