Please wait a minute...

Current Issue

2001 Vol.0, No. 3   Published: 28 June 2001
           
Design study

On landslide induced by water-fog from ski-jump energy dissipation of Longyangxia Hydropower Station

2001, 0 (3): 17-20   

Defect existed in dam foundation on the right bank of Xin′anjiang Dam and thought of its comprehensive treatment

2001, 0 (3): 21-23   

Data analysis

Method on verifying and analyzing the withdrawn data in dam safety monitoring

2001, 0 (3): 35-37   

Deformation analysis on Shitang Dam in its operation

2001, 0 (3): 38-39   

Sluice gate check and maintenance

Practice on the repair to the erosion area at the entrance section of the emergency gate slot at No.2 opening of the sluiceway of Liujiaxia Hydropower Station

2001, 0 (3): 40-44   

Check and test to the sluice gate and hoist of Liuxihe Power Station

2001, 0 (3): 45-49   

Rehabilitation

Application of PBM polymer concrete to repair the inlet floor of Qingtongxia Dam

2001, 0 (3): 50-52   

Erosion-resistant treatment for diversion spillway tunnel to Wuluwati Water Conservancy Project in Xinjiang

2001, 0 (3): 53-54