Please wait a minute...

Current Issue

Operation management

Research on calculation method of fuzzy-random risk for instability of gravity dam foundation

2011, 0 (4): 1-6   

Benefit increase by lowering river bed at Tankeng hydropower station

2011, 0 (4): 7-9   

Design points in adding rubber dam at spillway inlet of small reservoirs

2011, 0 (4): 10-11   

Data analysis

Research on seepage monitoring indicators for the reservoir basin of pumped storage power station

2011, 0 (4): 12-14   

Effect of combination of wall and curtain on seepage at deep and thick sand-gravel foundation

2011, 0 (4): 15-18   

Analysis and calculation on settlement and monitoring data of an embankment dam

2011, 0 (4): 19-22   

Analysis on the stress and strain data of Jiangya dam

2011, 0 (4): 23-27   

Reasons for high seepage pressure at foundation of Bailianya dam

2011, 0 (4): 28-30   

Analysis on abnormal gushing at the drain holes of Jiangkou hydropower station

2011, 0 (4): 31-33   

Construction technology

Construction technology of curtain grouting at Fengman concrete dam

2011, 0 (4): 34-39   

Static pressure grouting for sand and gravel overburden

2011, 0 (4): 40-42   

Application of bailey beam aqueduct method in aqueduct construction of Chang river main canal project

2011, 0 (4): 43-45   

Construction of joint grouting at Tekeze dam

2011, 0 (4): 46-48   

Application of analytic hierarchy process in selection of soil yard

2011, 0 (4): 49-52   

Detection technology

Simulation of defect detection by ground penetrating radar based on MATLAB

2011, 0 (4): 53-56   

Metal structure

Repairing the gate of a small reservoir

2011, 0 (4): 57-58   

Safety protection technology for ship elevators at Shuikou hydropower station

2011, 0 (4): 59-62   

Technology information overseas

Dam safety, emergency action plans and water alarm systems

2011, 0 (4): 63-68   

Improving the safety of dam infrastructure——RCC makes the grade

2011, 0 (4): 69-74