Please wait a minute...

Current Issue

Design study

Seepage prevention at upstream face of concrete gravity dams with geomembrane

2011, 0 (6): 1-6   

Design and research of down horizontal gate

2011, 0 (6): 7-11   

Design of the plastic concrete cut-off wall at Chaoyanggou reservoir

2011, 0 (6): 12-18   

Operation management

Application of echo sounder in sediment elimination of sand sill at Gezhouba hydropower station

2011, 0 (6): 13-16   

Research on health diagnosis system of Shuanglong reservoir based on attenuation of soil material indexes

2011, 0 (6): 17-19   

Data analysis

Structural safety analysis of Banqiao reservoir main dam

2011, 0 (6): 20-23   

Cause analysis on high uplift pressure at the buttress No.7 of Xinfengjiang dam

2011, 0 (6): 24-26   

Construction technology

Application of foundation replacement in invert siphon of Beiru river in south-to-north water diversion project

2011, 0 (6): 27-28   

Control technique for high accuracy underwater installation of large prefabricated components

2011, 0 (6): 29-36   

Rehabilitation

Application of abrasion-resistant concrete in Hongkou hydropower project

2011, 0 (6): 37-41   

Grouting test for the inlet/outlet cut-off wall curtain reinforcing of TPSPS

2011, 0 (6): 42-45   

Technology information overseas

Investigation on failure of Lake Delhi Dam

2011, 0 (6): 46-51   

Turbulent seepage in a 6-m rockfill dam——field measurements, analytical and numerical solutions

2011, 0 (6): 52-56   

Development of dam safety management system

2011, 0 (6): 57-65