Standards for safety assessment of hydropower projects based on engineering experiences

LIU Shi-huang

2013, 0 (3): 10-14   

Risk analysis and impact assessment of barrier dam failure in Qiaraigir Ravine

LI Xiao-qing, ZHAO Xin and GAO Qiang

2013, 0 (3): 15-19   

Analysis on extension of cracks on the reinforced concrete piers

JIANG Huai-yan

2013, 0 (3): 20-22   

Influence of higher-level storage of Danjiang dam on seepage-prevention and drainage of Huanglongtan dam

LIANG Guo-qing and GU Shao-feng

2013, 0 (3): 23-26   

Special deformation characteristics of gravity dam in safety monitoring

WEI De-rong and WANG Yu-jie

2013, 0 (3): 27-30   

Analysis on seepage along the water conveyance system of Tianhuangping pumped storage power station

LIN Zhi and ZHU Jin-jie

2013, 0 (3): 31-35   

Analysis on monitoring data during construction of the diversion tunnel No.1 of Jinping Ⅱ hydropower station

WU Zhong-ming, SHEN Ya-xing,YANG Fa-dong and LI Shu-lin

2013, 0 (3): 36-40   

Analysis on leakage of concrete face rockfill dam of the lower reservoir in Xikou pumped storage station

ZHANG Yong and ZHOU Jian-zhai

2013, 0 (3): 41-44   

Effect of drainage hole grouting and slope filtration drainage protection of Yele dam

ZHENG Pei-xi, YUAN Shu-chao and LI Sheng-qing

2013, 0 (3): 45-50   

Geological disaster monitoring system for reservoir region and its application based on IoT

HUANG Sheng-xiang, ZHANG Zong-shen, HE Jin-ping and ZHOU Xiao-gang

2013, 0 (3): 51-55   

Renovation of automatic monitoring system at Bikou dam after Wenchuan Earthquake

CHEN Rong

2013, 0 (3): 56-60   

Treatment of seepage at the structural joints by chemical grouting in Longkaikou powerhouse

ZHOU Yan, XU Xian-liang and YANG Meng

2013, 0 (3): 61-65   

Analysis on seepage of Zhaoshandu dam and its treatment

JIN Peng-cheng and ZHANG Shi-luan

2013, 0 (3): 66-69