Abstract: Aimed at the leakage at the pier of Zhaoshandu reservoir dam, stages of treatment were carried out, namely the treatment of construction joint, expansion joint and cutoff wall. By application of measures such as rehabilitation, water sealing and underwater grouting, the treatment was completed and good effect was achieved.
Key words: cement slurry, water-cement ratio, uplift reduction coefficient, experiment construction, underwater positioning, underwater grouting
摘要: 结合赵山渡水库大坝浅槽区闸墩喷射性漏水的情况,加固工程采取分阶段施工,分别进行施工缝和伸缩缝、防渗墙处理。施工方案制定严谨,过程中工艺灵活,技术上采用加固止水、水下灌浆等措施,成功完成了对重力坝施工缝及防渗墙漏水的修复加固。
关键词: 水泥浆液, 水灰比, 扬压力折减系数, 试验性施工, 水下定位, 水下灌浆
JIN Peng-cheng and ZHANG Shi-luan. Analysis on seepage of Zhaoshandu dam and its treatment[J]. dam, 2013, 0(3): 66-69.
金鹏程,张士銮. 赵山渡大坝渗漏分析及加固处理[J]. 大坝与安全, 2013, 0(3): 66-69.