dam ›› 2013, Vol. 0 ›› Issue (3): 41-44.

Previous Articles     Next Articles

Analysis on leakage of concrete face rockfill dam of the lower reservoir in Xikou pumped storage station

ZHANG Yong and ZHOU Jian-zhai   

  1. Ningbo Xikou Pumped Storage Station Co., Ltd.
  • Received:2013-04-12 Revised:2013-04-27 Online:2013-07-01 Published:2013-07-01

溪口蓄能电站下水库面板堆石坝渗漏分析

张勇,周建宅   

  1. 宁波溪口抽水蓄能电站有限公司
  • 作者简介:张勇(1980-),男,溪口电站水工专责工程师,杭州电子科技大学项目管理在读工程硕士,主要从事水利水电工程管理工作。

Abstract:

Combined with the engineering experience, this paper introduces the main influencing factors of leakage amount of the face rockfill dam. As well, the leakage law in condition of frequent changes of the reservoir water level is analyzed, for reference.

Key words: face slab, rockfill dam, leakage, analysis

摘要: 结合工程实例,介绍了影响面板堆石坝渗漏量的主要因素及大坝在库水位频繁变化的情况下,渗漏量变化的规律,为类似工程的设计及安全运行提供了宝贵的经验。

关键词: 面板, 堆石坝, 渗漏, 分析