Rehalibitation of hydraulic steel gates in Huangtankou hydropower station

FEI Xiu-yu   

  • Online:2006-02-28 Published:2006-02-28

黄坛口水电站水工钢闸门更新改造

费修渔   

  1. 浙江华电乌溪江水电厂,浙江衢州 324000

Abstract: Huangtankou hydropower station was built in the 1950s. In the second-round dam safely periodic inspection, many defects and perils were detected out. Rehabilitation for the steel gates and hoists were applied and the effect obtained is satisatactory

摘要: 黄坛口水电站建于20世纪50年代。在第二次大坝安全定期检查中,发现钢闸门和启闭机存在许多缺陷。闸门和启闭机的更新改造已经进行,并取得良好效果。