• Metal structure • Previous Articles Next Articles
FEI Xiu-yu
Online:
Published:
费修渔
Abstract: Huangtankou hydropower station was built in the 1950s. In the second-round dam safely periodic inspection, many defects and perils were detected out. Rehabilitation for the steel gates and hoists were applied and the effect obtained is satisatactory
摘要: 黄坛口水电站建于20世纪50年代。在第二次大坝安全定期检查中,发现钢闸门和启闭机存在许多缺陷。闸门和启闭机的更新改造已经进行,并取得良好效果。
费修渔. 黄坛口水电站水工钢闸门更新改造[J]. .
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://magtech.dam.com.cn/EN/
http://magtech.dam.com.cn/EN/Y2006/V0/I1/57