Abstract: The article gives a brief introduction on design, arrangement and operation of hydraulic steel structures of Upper Paunglaung hydropower project, for reference.
Key words: Upper Paunglaung hydropower project, hydraulic steel structure, design and arrangement, operation
摘要: 就上邦朗(Upper Paunglaung)水电站金属结构的设计与布置进行了介绍,并简述了电站金属结构的操作运行。
关键词: 上邦朗水电站, 金属结构, 设计与布置, 操作运行
WANG Chu-jun and JI Xue-song. Design and arrangement of hydraulic steel structure of Upper Paunglaung hydropower project[J]. dam, 2016, 0(6): 47-.